Sheertex
Industrial
Pointe-Claire, Qc
Expansion and refurbishment of a warehouse for the new factory
Project description
This project involved providing electrical engineering services for the construction of the new Sheertex plant. The mandate covered a 138,000-square-foot expansion and the redevelopment of an existing warehouse to accommodate the new production facilities.
Expertise
- Building electricity
Mandate features
- New 25kV start-up with electronic protection relay.
- 4MVA outdoor oil-filled transformer at 347/600V.
- New switching equipment rated at 5000A at 347/600V.
- Normal electrical distribution for the new plant.
- Connection of mechanical equipment (ventilation and plumbing).
- Indoor and outdoor lighting and control systems.
- Emergency lighting system.
- Fire alarm system.
- Grounding network and MALT belt for the transformer.
- Protection coordination study.
- Single-line diagram of the electrical distribution system.
