Project description

The project consisted of producing a coordination study report for a new electrical installation. The analysis focused on selectivity between the main circuit breaker and the devices in the new 600V distribution system.

Expertise
  • Coordination study
  • Study of arc flashes
Mandate features
  • Technical data sheet for protective equipment.
  • Modeling of the electrical network and time-current curves.
  • Analysis of selectivity between the main circuit breaker and the 600V distribution system.
  • Selection of optimal settings for protective devices.