Skip to content Skip to footer

Montreal City Hall

Government buildings
Montreal, Qc

Restoration of Montreal City Hall

Project description

The project consisted of conducting a coordination and arc flash study for Montreal City Hall. This analysis was carried out in connection with a project to add and replace new electrical conduits within the building.

Expertise
  • Coordination study
  • Arc flash study
Mandate features
  • Preparation of the report on arc flash studies and coordination of protective measures.
  • Settings for differential protection.
  • Production of arc flash labels to ensure worker safety.

Rethinking today's engineering, for tomorrow's world.