Construction of a new 4 MW data center
Project description
This project involved providing electromechanical engineering services for the construction of a new 4MW Tier III data center, designed to be robust, resilient, and scalable. The objective was to ensure a reliable infrastructure for critical equipment through redundant systems and a new 25kV electrical input.
Expertise
- Building electricity
- Building mechanics
- Coordination study
Mandate features
- Upgrade of the main electrical input to 25kV.
- Four 2MW generators.
- Diesel fuel distribution system with a 25,000-liter tank and two redundant pump systems.
- 4 power transformers rated at 2.5MVA.
- 4 uninterruptible power supply (UPS) systems rated at 2MVA.
- 4 bypass devices rated at 2000A at 480V.
- Server room layout (distributed cabling and air circulation).
- Cooling systems for temperature control.
- Ventilation and air conditioning system for server rooms.
- Pre-action fire alarm system for critical rooms.
- Grounding network including the raised floor of the server room.
- Plumbing and drainage system.