Project description
This design-build project covered the complete electrical engineering for a new 30 MW cryptocurrency mining facility on Léger Street in Sherbrooke. The scope extended from the main 25 kV electrical entrance to the final connection of the production equipment.
Expertise
- Building electrical systems
Mandate features
- 30 MW electrical entrance with 2 pole-mounted metering units at 25 kV.
- 10 power transformers of 3.2 MVA.
- Dedicated power distribution for the miners at 240/415V.
- Connection of mechanical systems for miner cooling.
- Fire alarm and emergency lighting system.
- Protection coordination study (from 25 kV down to the 240/415V network).
- Grounding network.