Bitfarms
Industrial
Baie-Comeau, Qc
Construction of a 22 MW mining farm
Project description
This design-build project covered the complete electrical engineering for a new 22 MW cryptocurrency mining facility. The scope extended from the main 25 kV electrical entrance to the final connection of the production equipment.
Expertise
- Building electrical systems
Mandate features
- 22 MW electrical entrance with 2 pole-mounted metering units at 25 kV.
- 8 power transformers of 3.2 MVA.
- Dedicated power distribution for the miners at 240/415V.
- Connection of mechanical systems for miner cooling.
- Fire alarm and emergency lighting system.
- Protection coordination study (from 25 kV down to the 240/415V network).
- Grounding network.
