Construction of a 20 MW mining farm.

Project description

This design-build project covered the complete electrical engineering for a new 20 MW cryptocurrency mining facility. The scope extended from the main 25 kV electrical entrance to the final connection of the production equipment.

Expertise
  • Building electrical systems
Mandate features
  • 20 MW electrical entrance with 1 pole-mounted metering unit at 25 kV.
  • 6 power transformers of 3.2 MVA.
  • Dedicated power distribution for the miners at 240/415V.
  • Connection of mechanical systems for miner cooling.
  • Fire alarm and emergency lighting system.
  • Protection coordination study (from 25 kV down to the 240/415V network).
  • Grounding network.