Aréna Marcel Larocque
Sports and leisure
St-Jean-sur-Richelieu, Qc
Addition of two new chillers and a new natural gas generator set
Project description
This project, carried out in design-build mode, covered the engineering for the improvement of the emergency power supply system. The work included adding a new generator set and designing the distribution system to power new critical-use chillers.
Expertise
- Building electricity
Mandate features
- 44kVA generator dedicated to powering the chillers, installed on a slab on the ground near the arena.
- New emergency distribution in the main electrical room.
- Connection of the two new coolers installed on the roof.
- Interception of existing circuits for transfer to emergency power supply.