The project consists of final BIM coordination before work is carried out to ensure that the electrical design is well coordinated with all other disciplines involved. Validation of the modification of the lightning protection system was also part of the mandate.
CIUSSS – Expansion of the Verdun hospital
The project consists of final BIM coordination before work is carried out to ensure that the electrical design is well coordinated with all other disciplines involved. Validation of the modification of the lightning protection system was also part of the mandate.
ClientClient nameYear2025AuthorAuthor nameShare
